F&L Remodel

Friday, February 20, 2015

Views of acrches and insets for art. We added a light and switch in arch.



Posted by GMG Construction, Inc at 3:54 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Access to new walk in closet in laundry rm.


Posted by GMG Construction, Inc at 3:51 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

New mechanical vent for hood above the new cook top.


Posted by GMG Construction, Inc at 3:50 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Nice new access hatch in pantry floor accessing crawl space.



Posted by GMG Construction, Inc at 3:49 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Flooring finished and shot of new trim for base






Posted by GMG Construction, Inc at 3:49 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Progress shots of remodel





Posted by GMG Construction, Inc at 3:47 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Friday, February 13, 2015

More flooring shots of new and protected flooring






Posted by GMG Construction, Inc at 8:34 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

New flooring updates






Posted by GMG Construction, Inc at 8:33 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Saturday, February 7, 2015

Flooring and progress notes

 Extra flooring was pickup and layed out in kitchen to acclimatise to the environment. Flooring will resume Monday now electrical is on again.. Mechanical for down draft will happen Monday also. The template for the back splashes can be done on Wednesday. Will pick up samples at Pental on Tuesday. More pictures to come next week.
Sincerely Ballard
GMG Construction Inc
Posted by GMG Construction, Inc at 3:11 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Wall to existing laundry rm has multiple water, waste pipes and heater ducts. This only allows a 30 inches opening. I could do a pocket door on inside of wall making a 12" jamb thickness or just an opening walk in ?




Posted by GMG Construction, Inc at 3:05 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Electrical rough in for garbage and insta hot water as well as dishwasher hard wired


Posted by GMG Construction, Inc at 3:02 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Electrical rough in completed on pendant lights x3, GFI outlets x6 switches x5, new recess 6" cans above new cook top and move old hallway lights and 2 cans.






Posted by GMG Construction, Inc at 3:00 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Thursday, February 5, 2015

Beginning of the beautiful new solid prefinished wood floors.


Posted by GMG Construction, Inc at 7:20 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Electricians showed today and will need 2 days.


Posted by GMG Construction, Inc at 7:18 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

New plumbing rough in completed and ice maker moved and gas.



Posted by GMG Construction, Inc at 7:17 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

New island wall for plumbing and electric and strength. Plumbing removed and rerouted for upstairs hallway bathroom.





Posted by GMG Construction, Inc at 7:16 PM 1 comment:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Bearing post installed as far over as possible. Fixed posting bearing point load under house .




Posted by GMG Construction, Inc at 7:14 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

About Me

My photo
GMG Construction, Inc
GMG construction is a full-service, design/build residential remodeling company. We specialize in custom homebuilding, room additions and second story additions as well as kitchen & bath remodels.
View my complete profile

Blog Archive

  • ▼  2015 (52)
    • ►  June (6)
    • ►  March (14)
    • ▼  February (17)
      • Views of acrches and insets for art. We added a li...
      • Access to new walk in closet in laundry rm.
      • New mechanical vent for hood above the new cook top.
      • Nice new access hatch in pantry floor accessing cr...
      • Flooring finished and shot of new trim for base
      • Progress shots of remodel
      • More flooring shots of new and protected flooring
      • New flooring updates
      • Flooring and progress notes
      • Wall to existing laundry rm has multiple water, wa...
      • Electrical rough in for garbage and insta hot wate...
      • Electrical rough in completed on pendant lights x3...
      • Beginning of the beautiful new solid prefinished w...
      • Electricians showed today and will need 2 days.
      • New plumbing rough in completed and ice maker move...
      • New island wall for plumbing and electric and stre...
      • Bearing post installed as far over as possible. Fi...
    • ►  January (15)
Watermark theme. Powered by Blogger.